This is the Laatu bamboo bridge which has replaced
an old RCC structured based bridge connecting Laatu withKarimganj. Previously
there was a huge RCC bridge but heavy flood had eroded it. It is connecting
around 5000 people living there with rest of the places in the Karimganj district.
Surprisingly the condition of the bridge is same as it was a year before
leaving the localities’ with unending problems. Because of this condition of
the bridge the people of this area can not call for 108 in an emergency situation.
Even the students have to walk a long way for betters studies. It is too sad to
say that many girls of these areas have given up their studies. The localities’
has alleged that when the election approaches nearer ministers came there and
even promises to reconstruct the bridge but till date no such promises are been
kept.
Whatever may be the reason for this delaying
in the reconstruction of this bridge, but the people of this area are greatly hindered
by this. Government should see into this and should save the lives of peoples
of Laatu and the other neighboring areas of it
No comments:
Post a Comment